7.1.3        Cleaning Maintenance

The cleaning period depends on the operating environment and frequency, please decide the cleaning period based on site requirements.

Item

Operating state

Cleaning period

Solution

Robotic arm

OFF

1 month

Please clean the surface with clean cloth

Wind tunnel

OFF

2 weeks

Please clean the impurities stored in the wind tunnel with air gun or clean cloth

Screw rod of Z-axis

OFF

12 months

Please add lubricating oil or grease. For details, please see 7.2.1 Greasing Screw Rod of Z-axis

Guide rail of Z-axis

OFF

2 weeks

Please add lubricating oil or grease. For details, please see 7.2.2 Greasing Guide Rail of Z-axis

 

Common disinfectant, cleaning liquid can be used for cleaning robotic arm. Please do not use acidic cleaning fluid for routine maintenance.














 Issue V1.2.1 (2019-04-10)User GuideCopyright © Yuejiang Technology Co., Ltd